Installing The Camshafts; Checking The Valve Timing - Husqvarna FE 350 2014 Repair Manual

Table of Contents

Advertisement

ENGINE
18
18.5.22

Installing the camshafts

18.5.23

Checking the valve timing

�·-
0
:i:. - ••
, -
,.
l '. ,
-
Mount and tighten nut
Guideline
Nut, cylinder head
-
Pull up the timing chain and insert intake camshaft
-
Place the timing chain over the camshaft gear of the intake camshaft.
✓ Markings
✓ Lock ring G) engages in groove (9.
Ensure that bleeder @ are seated properly.
-
Slip in exhaust camshaft
-
Place the timing chain over the camshaft gear and position the camshaft in the
bearing seat.
-
Clean all oil nozzles thoroughly and blow out with compressed air.
-
Mount the camshaft bearing bridge.
✓ Markings
✓ Lock ring G) engages in groove (9.
-
Position guide rail
-
Mount screws
Guideline
Screw, camshaft bearing
bridge
Condition
Camshaft gears were not loosened.
-
Mount the special tool and tension the timing chain.
I
Insert, timing chain tensioner (77229035000) (
-
Position special tool
I
Adjustment bush bridge (77229050044) (
-
Check the valve timing.
The special tool must be in full contact with the flat areas.
If the special tool is not in full contact:
-
-
-
-
CD
with the washer.
M6
f)
are aligned with the flat areas of the camshaft.
CD.
f)
are aligned with the flat areas of the camshaft.
Info
Ensure that the dowel pins are seated properly.
8.
0
and tighten from the inside to the outside.
M7x1
O .
Take off the special tool.
Remove the camshaft. (
,....
p. 132)
Pull the camshaft gears off the camshafts.
Adjust the valve timing. (
p. 181)
,....
10 Nm
Lubricated with
(7.4 lbf ft)
engine oil
O.
14 Nm
Lubricated with
(10.3 lbf ft)
engine oil
,....
p. 265)
p. 265)
,....
180

Advertisement

Table of Contents
loading

Table of Contents