Take-up Shaft Holder Unit
Supply Shaft Holder Unit
(6) Install the Intermediate Gear, Torque Clutch and Cut
Washer in order.
(7) Install the Change Gear.
NOTE:
When install the replacement parts; apply the Floil
Grease (VFK1298A).
Intermediate Gear
Torque Clutch Unit
Cut Washer
Fig.A12
Fig.A13
Intermediate Gear
Change Gear
Fig.A14
(8) Install the Take-up Loading Arm Unit.
NOTE:
When install the replacement parts; apply the Floil
Grease (VFK1298A).
Take-up Loading Arm Unit
Note:
Install the boss of the Take-up Shaft Holder Unit into the Hole
of the Take-up Loading arm Unit.
Hole of the Take-up Loading arm Unit Unit
Boss of the Take-up
Shaft Holder Unit
(9) Install the Supply Loading Arm Gear Unit, adjusting the
phase between Take-up Loading Gear and the Supply
Loading Gear as shown in Fig.A12.
18
Fig.A15
Take-up Loading Arm Unit
Fig.A16
Supply Loading Arm Unit
Fig.A17