Biasi BASICA COND User Manual And Installation Instructions page 3

Table of Contents

Advertisement

The manual must be read thoroughly, so that you will be able to use the boiler in a safe
and sensible way and must be carefully kept. It may be necessary for reference in the
future.
The first firing must be carried out by a competent and responsible Gas Safe engineer.
The manufacturer
• disclaims all liability for any translations of the present manual from which incorrect
interpretation may occur;
• cannot be held responsible for non-observance of instructions contained in this manual
or for the consequences of any procedure not specifically described.
Please ensure that the installer has fully completed the Benchmark Checklist on the inside
back pages of the installation instructions supplied with the product and that you have signed
it to say that you have received a full and clear explanation of its operation. The installer is
legally required to complete a commissioning checklist as a means of complying with the
appropriate Building Regulations (England and Wales).
All installations must be notified to Local Area Building Control either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be
issued to the customer who should, on receipt, write the Notification Number on the Bench-
mark Checklist.
This product should be serviced regularly to optimise its safety, efficiency and performance.
The service engineer should complete the relevant Service Record on the Benchmark
Checklist after each service.
The Benchmark Checklist will be required in the event of any warranty claim.
Before lighting the boiler you are advised to have a Gas Safe Registered Engineer
check that the installation of the gas supply is
• gas-tight;
• of the correct gauge for the flow to the boiler;
• fitted with all the safety and control devices required by the current Regulations.
Ensure that
• the installer has connected and terminated the pressure relief valve in a manner which
allows safe discharge. The manufacturers are not responsible for damage caused by
opening of the pressure relief valve and consequent escape of water, if this is not con-
nected and terminated.
• the installer has connected the condensate outlet to a suitable drain pipe.
Remember that...
- 3 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents