Electrical Connections
Main AC Wiring
T2
T1
N2
N1
E1
GND
23
E2
194
GENERATOR CUSTOMER
JUNCTION BOX
CUSTOMER SUPPLIED
NOTE: Main AC wiring must be in accordance with local
jurisdiction and codes.
1. Strip the insulation off the wire ends. Do not
remove excessive insulation.
2. Open the controller access panel and latch it.
Loosen the lugs of the Main Breaker through the
access holes.
3. Insert a power wire (E1 or E2) into the bottom lug
of the Main Breaker. Torque to the proper
specification.
4. Connect the Neutral wire to the Neutral bar and
torque to the required specification. See
5. Connect the Ground wire to the Ground bar and
torque to the required specification. See
6. Plug the breaker access hole with the cap plugs
provided (see
Parts Shipped
7. Unlatch the controller access panel by pulling
towards you and then close the lid.
8. Confirm the integrity of the ground wire connection
between the electrical access panel and the
ground lug while closing the customer connection
box using the two short Allen screws.
NOTE: Neutral Bonding - For installations that require
the neutral to be bonded to the ground, this is to be done
on the customer connections terminals inside the
generator. Connect a suitably sized wire from the neutral
bar to the ground bar. This is normally required when the
generator is the source in a separately derived system. It
26
CONNECTION
GROUND
Figure 6-2. Main AC Wiring
Figure
Figure
Loose).
RTS TRANSFER SWITCH
194
194
+12VDC
23
23
TRANSFER
WARNING
NOTE WIRE ORIENTATION
N1 N2
T1
GRN
NEUTRAL BLOCK
TO GROUNDING
ELECTRODE
is not required when the generator is a backup source in
a utility supplied electrical system with a 2-pole transfer
switch. See
Figure
NOTE: Torque all wiring lugs, bus bars and connection
points to the proper torque specifications. Torque
specifications for the Main Line Circuit Breaker (MLCB)
can be found on a decal located on the inside of the
electrical access panel.
6-2.
6-2.
Installation Guidelines for 50 Hz PowerPact™
N1
N2
UTILITY
(C1 & VR1)
N1
N2
E1
E2
STANDBY
(C2 & VR2)
T1
T2
T2
T1
E1
E2
T2
NEUTRAL WIRES
(IF SUPPLIED)
NEUTRAL
PANELBOARD
(CUSTOMER LOAD)
6-1.
UTILITY
METER
SOCKET
001130