Installation sequence
Connections on the flue gas side
All current regulations on installing and commission-
■
ing flue systems have been observed.
■
The manufacturer's instructions for the installation
and commissioning of the electrostatic precipitator
have been observed.
Ø
= Ø
Fig. 16
1. Install the flue pipe with a rise to the chimney (pref-
erably 45°).
Flue pipe (internal diameter):
Max. flue pipe length: 3000 mm
2. The entire flue pipe with cleaning aperture must be
gas-tight.
Making the connections on the heating water side
Note
Route water pipes so that all casing panels are acces-
sible and can be removed for maintenance.
24
(cont.)
= Ø
= 2 x Ø
200 mm
7
Note
■
Install a flexible connection piece in the flue to pre-
vent sound transmission from the flue gas fan.
Additional on-site sound insulation measures may be
required.
Never brick the flue pipe into the chimney.
■
Let the flue pipe connector project about 10 mm into
■
the chimney. This prevents condensate or rainwater
from the chimney running into the flue pipe.
Flue gas temperatures below 90
partial load operation of the boiler.
Connect the boiler to a moisture-resistant chim-
■
ney.
■
Install a boiler flue connection with condensate trap
in the flue pipe.
Boiler flue connection with condensate trap (for
A
horizontal installation)
Thermal insulation
B
C
Cleaning aperture with test connector for checking
flue gas temperature and emissions
Test connector calming stretch
■
Upstream of the test connector:
Total 3 x
of the flue pipe
7
To the last pipe bend: Min. 2 x
–
To the flue outlet: Min. 1 x
–
■
Downstream of the test connector:
At least 1 to 2 x
of the flue pipe
7
Flexible flue pipe inlet
D
Possible installation location for the draught stabil-
E
iser (draught limiter)
3. Thermally insulate the flue pipe, minimum insula-
tion thickness 30 mm.
4. Install a draught limiter (accessories) in the chim-
ney:
Draught limiter installation instructions
Note
Only connect controlled heating circuits with mixer.
C can occur during
º
7
7