Northern Telecom Meridian 1 Installation And Maintenance Manual page 36

Hide thumbs Also See for Meridian 1:
Table of Contents

Advertisement

Page 26 of 220 Installing the hardware
553-3601-200 Standard 7.00 November 1998
1.
Position the screw holes for the RPI using the dimensions shown in
Figure 10.
To provide adequate ventilation and to prevent overheating, leave a
clearance of at least 5 in. around the RPI.
If mounting two RPIs, one above the other, leave a clearance of at least
1 ft between them to provide adequate ventilation and to prevent
overheating.
2.
Insert molly screws in the holes.
3.
Partially screw in two #10 2-in. screws for the keyholes.
4.
Open the hinged cover with a screwdriver by pushing in and then down
to release the catch on the right side, as shown in Figure 11. You can
remove the cover by taking it off its hinges.
5.
Hang the RPI on the two keyhole screws and tighten them.
6.
Install the remaining two screws.
7.
Feed in the power cord through the bottom of the RPI and route it
through the clip and around the strain relief support as shown in
Figure 9.
8.
Route the power cord to the input power jack just to the left of PSU 1.
Connect the plug to the jack.
Note: Labeling RPIs distinctively may help with diagnosis if there are
problems in the future.

Advertisement

Table of Contents
loading

Related Products for Northern Telecom Meridian 1

Table of Contents