Heat & Glo SL-5-IFT Installation Manual page 31

Hide thumbs Also See for SL-5-IFT:
Table of Contents

Advertisement

Top Vent - Vertical Termination - (continued)
Three Elbows
Note: Use SLP Series
components only.
Figure 4.18
Heat & Glo • SL-5/5LP-IFT, SL-7/7LP-IFT, SL-9/9LP-IFT Installation Manual • 2632-980 Rev. E • 4/21
SL-5-IFT
V
MIN.
1
H MAX.**
90 Elbow
1/2 ft.
1/2 ft.
152 mm
1 ft.
1-1/2 ft. 457 mm
2 ft.
2-1/2 ft. 762 mm
4 ft.
3-1/2 ft.
1.1 m
6 ft.
4-1/2 ft.
1.4 m
14 ft.
* No specific restrictions on this value EXCEPT V
V
2
H
2
INSTALLED
HORIZONTALLY
SL-7-IFT
H MAX.**
152 mm
1/2 ft.
152 mm
305 mm
1 ft.
305 mm
610 mm
2 ft.
610 mm
1.2 m
4 ft.
1.2 m
1.8 m
6 ft.
1.8 m
4.3 m
14 ft.
4.3 m
H MAX. =14 ft. (4.3 m)
V
+ V
+ H
+ H
MAX. = 40 ft. (12.2 m)
1
2
1
2
+ V
+ H
1
2
Note: When using SLP-FLEX (6-5/8 in.) venting, there
**
MUST be a 25% reduction in total H when using flex vent.
See Figure 4.8.
H
1
SL-9-IFT
H MAX.**
V
V
2
0 ft.
0 mm
*
1 ft.
305 mm
*
2 ft.
610 mm
*
4 ft.
1.2 m
*
6 ft.
1.8 m
*
14 ft.
4.3 m
*
+ H
cannot exceed 40 ft. (12.2 m)
1
2
V
1
+ V
MIN.
1
2
*
*
*
*
*
*
31

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-5lp-iftSl-7-iftSl-7lp-iftSl-9-iftSl-9lp-ift

Table of Contents