Heat & Glo SL-5-IFT Installation Manual page 21

Hide thumbs Also See for SL-5-IFT:
Table of Contents

Advertisement

A
6 in. (minimum) up to 20 in.
152 mm/508 mm
20 in. and over
Wood or Fuel Oil
Termination Cap
B
**Gas
Termination
Cap
* If using decorative cap cover(s), this distance may need to be increased.
Refer to the installation instructions supplied with the decorative cap cover.
** If two gas terminations are present, they may be level (B = 0 inches)
provided A is a minimum of 6 inches.
Figure 4.2
Staggered Termination Caps
CAUTION! Risk of Burns! Termination caps are HOT,
consider proximity to doors, traffic areas or where people
may
pass or gather (sidewalk, deck, patio,
cap shields available. Contact your dealer.
• Local codes or regulations may require different
clearances.
• Hearth & Home Technologies assumes no responsibility
for the improper performance of the appliance when the
venting system does not meet these requirements.
• Vinyl protection kits are suggested for use with vinyl siding.
• Measure horizontal and vertical termination cap clearances
as noted in Figure 4.3 and Figure 4.4.
H=Measure Horizontal Distances from H
V=Measure Vertical Distances from V
V
V
Figure 4.3
Heat & Glo • SL-5/5LP-IFT, SL-7/7LP-IFT, SL-9/9LP-IFT Installation Manual • 2632-980 Rev. E • 4/21
B
18 in. minimum
457 mm
0 in. minimum
A *
etc.). Listed
H
H
C
C and E dimensions are defined in Figure 4.5.
Figure 4.4
Measure Horizontal and Vertical Termination
Clearance to Trapezoid Portion of Cap
OVERHANG
WALL
E
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sl-5lp-iftSl-7-iftSl-7lp-iftSl-9-iftSl-9lp-ift

Table of Contents