Grounding The Units - VeriFone UX300 Installation Manual

Hide thumbs Also See for UX300:
Table of Contents

Advertisement

S
ETUP

Grounding the Units

NOTE
NOTE
Grounding the
Units
NOTE
To ground the units
28
UX300 I
NSTALLATION
3
Secure the unit with M5 nuts with a minimum length of 12 mm. Tighten the
nuts using to the recommended torque of 7.0 kgfcm (6.1 lbf.in).
You can also mount the UX300 using welded screw bolts on the inner side of the
mounting plate. This prevents any vandalism of the screw heads on the outer
surface.
5
Connect flexible tubing with 9mm inner diameter to the drain nozzle at the
bottom of the UX300 (see
appropriate drainage area.
The nozzle drains water out of the bezel area through the flexible tube. Ensure
that the tubing is properly dressed and mounted as vertical as possible (without
any loops) to ensure smooth water drainage.
If you connect the UX300 to a UX-series PIN pad, use the following steps to
ground your units.
For cable use and ordering information, see
1
Remove mounting nuts from the back of the UX300 and the PIN pad unit (do
remove the nut securing the PIN pad cable retainer).
Figure 18
Grounding the UX300 and PIN Pad Units
2
Attach one end of the grounding cable (VPN WIR159-302-02-A) to the UX300
and connect the other end to a ground installation. See (C) in
3
Use another grounding cable (VPN WIR159-302-02-A) and attach one end to
the PIN pad mounting bolt. Connect the other end to a ground installation. See
(C) in
Figure
18.
4
Connect the UX300 to the PIN pad with another grounding cable (VPN
WIR159-302-01-A) using the same mounting bolts. See (A, B) in
G
UIDE
Figure
2) and place the other end of the tubing at an
Accessories and
B
C
Documentation.
UX100
A
C
Figure
18.
Figure
18.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents