Installing The Quaternary Pump - Agilent Technologies 1200 Series Manual

Quaternary pump
Hide thumbs Also See for 1200 Series:
Table of Contents

Advertisement

3
Installing the Pump

Installing the Quaternary Pump

Installing the Quaternary Pump

Parts required
#
1
1
Preparations
• Locate bench space.
• Provide power connections.
• Unpack the pump.
Module is partially energized when switched off, as long as the power cord is
WA R N I N G
plugged in.
Repair work at the module can lead to personal injuries, e.g. shock hazard, when the
cover is opened and the module is connected to power.
"Defective on arrival" problems
C A U T I O N
If there are signs of damage, please do not attempt to install the module. Inspection by
Agilent is required to evaluate if the instrument is in good condition or damaged.
1 Place the module on the bench in a horizontal position.
36
Part number
Description
Pump
Power cord, for other cables see text below and
Control Software (ChemStation, EZChrom, OL, etc.)
G4208A or
and/or a handheld controller (Instant Pilot or Control Module)
G1323B
Make sure that it is always possible to access the power plug.
Remove the power cable from the instrument before opening the cover.
Do not connect the power cable to the Instrument while the covers are removed.
Notify your Agilent sales and service office about the damage.
An Agilent service representative will inspect the instrument at your site and
initiate appropriate actions.
"Cable Overview"
1200 Series Quarternary Pump User Manual
on page 120

Advertisement

Table of Contents
loading

Table of Contents