Siemens SINAMICS S120 Getting Started page 47

Starter commissioning tool
Hide thumbs Also See for SINAMICS S120:
Table of Contents

Advertisement

Fig. 3-25
21.Choose Finish.
As you can see in Fig. 3-26, the configuration Wizard has created the objects
(including Drive_1) for drive unit SINAMICS_CU320 in the project navigator.
Fig. 3-26
22.Save project Project_2 by choosing Project > Save.
Once you have configured the drive unit with STARTER in OFFLINE mode, con-
tinue with the steps described in Chapter 4 "Starting the Drive Project (Motor Ro-
tates)", where you will set the drive interface parameters and start the motor.
 Siemens AG, 2004. All rights reserved
SINAMICS S120 Getting Started with the STARTER Commissioning Tool – 04.2004 Edition
Summary
Project navigator with SINAMICS_CU320
Creating the Drive Project OFFLINE
J
3-47

Advertisement