Maintenance and service
5.4 Performing a firmware and project update
If you are upgrading the firmware manually, proceed as follows:
1. Select the SINAMICS component in the Project Navigator, for example, SINAMICS
2. Double-click "Overview" in the project navigator.
3. Click "Version Overview" to open the list of connected SINAMICS components.
4. Go online and select the devices whose firmware you wish to update.
5. Click "Firmware update" to download the new firmware to the devices. To do so, you
6. When the firmware update is complete, switch the 24 V power supply off and on again.
Note
The SINAMICS components must be configured for a firmware update to take place. The
firmware cannot be updated if the components are not programmed.
You can also update the firmware by means of the Expert list. Refer to the
S120
5.4.5.4

Downloading the project to the target system

Once all the changes required for upgrading your project have been made, you must
download the project to the SIMOTION D410. You have recompiled the project and checked
it for consistency. Refer to section Save project, compile and check consistency (Page 183).
Prerequisite
The firmware required is located on the CompactFlash Card; for information, refer to the
section titled Update via CF card (Page 190).
Procedure
1. Save and compile the project.
2. Click "Connect to selected target systems" to establish a connection to the target system.
3. Execute "Download project to target system" and then "Copy RAM to ROM" to download
4. Because of the automatic follow-up configuration in the SINAMICS Integrated drive, you
5. Save the project.
192
Integrated.
The "SINAMICS_Integrated - Overview" dialog box opens with a list of available drive
objects.
The list displays the current firmware version of the devices.
must select all components whose firmware is to be updated.
The device is now ready for operation.
Commissioning Manual for a description of this procedure.
the upgraded project to the CF card as well.
must now execute "Load CPU / drive unit to PG".
SINAMICS
SIMOTION D410
Commissioning Manual, 02/2012