1 Getting Started:
Table 3. Task List to Install a New G700 (with an S8300 or Local Survivable
Processor) Continued
Task
"Complete the Installation Process
(On S8300 Primary Controller Only)"
on page 142
32
Subtasks (If any)
"Configure the Destination for G700 SNMP Traps" on
page 142
"Register the system" on page 143
"Back up the System" on page 143
Installation and Upgrades for the G700 with an S8300/S8700
555-234-100 — Issue 2 — October 2002
Installation Roadmap and Task Lists
6 of 6