Precautions For Severe Job Condition - Komatsu PW118MR-11 Operation & Maintenance Manual

Wheeled excavator
Table of Contents

Advertisement

OPERATION
Towing method of the machine without outriggers
Fit a suitable pin (2) in the hole shown and hold it in place with
the screws or safety locking pin and hook the chain to the pin.
Towing method of the machine with outriggers
Fit a suitable pin (3) in the hole shown and hold it in place with
the screws or safety locking pin and hook the chain to the pin.
Towing method of the machine with blade
Connect the chain to the blade (4) as shown in the figure.

PRECAUTIONS FOR SEVERE JOB CONDITION

When performing digging operations in water, if the work equipment mounting pin goes into the water, per-
form greasing every time the operation is performed.
For heavy-duty operations and deep digging, perform greasing of the work equipment mounting pins every
time before operation.
After greasing, operate the boom, arm and bucket several times, then grease again.
WENAM00130
TROUBLES AND ACTIONS
RKA52630
RKA52640
RKA52650
3-245

Advertisement

Table of Contents
loading

Table of Contents