Use the correct screws; see the diagram
Slide 75
Study the diagrams and follow the notes in the manual.
This will help you to figure out which rail should go on the left and which on the
right, and which way up they should be.
Which way round to install the guide?
See the diagram on the slide.
There are two criteria.
The edge with the pin inserted should be at the top.
The face with the threaded holes should be facing the outside of the
machine. The other face has non-threaded holes only.
Slide Rails
Holes at the top
Blue: Stepped screws
Black: M4 x 6 screws
Screw holes facing
the outside
75
Beluga-C1/C1.5 Training