Installing The Operator Information Panel Assembly - IBM Storwize V7000 Unified Series Problem Determination Manual

Hide thumbs Also See for Storwize V7000 Unified Series:
Table of Contents

Advertisement

8. If you are instructed to return the operator information panel assembly, follow

Installing the operator information panel assembly

The following procedure is for a Tier 1 customer replaceable unit (CRU).
Replacement of Tier 1 CRUs is your responsibility. If IBM installs a Tier 1 CRU at
your request, you will be charged for the installation. Service agreements can be
purchased so that you can ask IBM to replace these units.
To install the replacement operator information panel assembly, complete the
following procedure.
1. To help you work safely with Storwize V7000 Unified file modules, read the
2. Slide the operator information panel assembly into the server until it clicks into
3. Inside the server, connect the cable to the rear of the operator information panel
4. Install the cover, as described in "Installing the cover" on page 84.
5. Slide the file module into the rack.
6. Reconnect the external cables; then, reconnect the power cords and turn on the
Removing a microprocessor and heat sink
The following procedure is for a field replaceable unit (FRU). FRUs must be
installed only by trained service technicians.
140
Storwize V7000 Unified: Problem Determination Guide Version
all packaging instructions, and use any packaging materials for shipping that
are supplied to you.
safety information in "Safety" on page xi, "Safety statements" on page xiii, and
"Installation guidelines" on page 54.
place.
assembly.
peripheral devices and the file module.
Note: You must wait approximately 2.5 minutes after you connect the power
cord of the file module to an electrical outlet before the power-control button
becomes active.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents