Hardware installation
Turning on DC power supplies
Turn on an Ethernet Routing Switch 8300 Series chassis with a DC power supply.
Procedure steps
1. Turn the power switch on each DC power supply to the on position.
2. Verify that the power LED on each power supply turns green.
3. Verify that the power supply status LEDs and the fan LED on the 8393 or 8394 SF/
LED power supply
After you turn on the Ethernet Routing Switch 8300, each module automatically initiates a
diagnostic test to verify proper module function.
Perform the following procedure if the power supply LED remains off.
Procedure steps
1. Turn the power switch on each power supply to the off position.
2. Wait 1 minute.
3. Turn the power switch on each power supply to the on position.

Verifying a successful installation

The following list describes a successful starting sequence for an Ethernet Routing Switch:
• When power is applied to the Ethernet Routing Switch 8300, the green LED on each
power supply and fan tray turns on, and the Online LED for each module is amber.
• Each module initiates a self-test, during which time the port and module LEDs display
various patterns to indicate the progress of the self-test.
34
Quick Start
If your chassis contains two or three power supplies, turn on the power supplies
simultaneously. If you wait longer to turn on the second power supply, one of the
power supplies can shut off within 7 seconds. To correct this condition, turn off the
power supplies for a short period of time and then turn on the power supplies again
simultaneously.
CPU modules turn green.
The red fan tray fail LED may light briefly while the fans power to operational
speed.
May 2011