THUNDER TIGER Titan Raptor 50 Size 3D Heli Assembly & Maintenance Manual page 20

Table of Contents

Advertisement

19 Servo Installation-Part2
Assembly Tip: Remove all the servo wheels prior to attaching the steel
linkage balls. Make sure all linkages are the correct length.
See Engine-Throttle Control Linkage in page 22.
(1)HSE2612N Self Tapping Screw(M2.6x12).....8
(2)HSE2620N Self Tapping Screw(M2.6x20).....4
(3)BK0104 Servo Mounting Plate.......................4
(4)BK0833 Servo Block...................................... 2
(5)BK0834 Pitch Lever Fixed Plate.....................1
(6)HMC3-18 Socket Screw (M3x18)...................1
(7)BK0113 Linkage Rod (M2.3x18).................... 2
(8)BK0085 Ball Link............................................4
(9)BK0086 Ball Link............................................4
(10)BK0839 SUS Linkage Rod (M2.3x30)..........1
(11)BK0841 SUS Linkage Rod (M2.3x60)..........1
(12)BK0075 Linkage Ball....................................4
(13)HMF2-8N Screw (M2x8)...............................4
(14)HML2 Nut (M2)............................................ 4
(9)
(10)
45mm
(8)
(7)
30mm
Pitch Linkage Rod Subassembly.
(5)
(2)
Pitch push-pull lever subassembly.
(9)
(10)
(6)
(8)
(7)
(5)
(1)
(4)
(2)
(3)
(1)
(11)
(9)
(4)
(3)
(1)BK0835 Pitch Push-Pull lever................1
(1)
(2)HMV740ZZY Bearing (d4xD7xW2.5)....2
(3)BK0075 Linkage Ball.............................3
(4)HMJ2-8N Self Tapping Screw(M2x8)....3
(5)BK0846 Collar (d3xD4x8.5)...................1
Mount the Steel Link
Ball at 10.5mm(approx
7/16") from the center
of the servo horn for
the throttle arm.
Throttle linkage Rod subassembly.
19
Futaba
(9)
75mm
(11)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents