THUNDER TIGER Titan Raptor 50 Size 3D Heli Assembly & Maintenance Manual page 14

Table of Contents

Advertisement

12 Flybar Assembly
Begin by attaching six Linkage Balls to the Flybar Control Arm and Mixing Lever with Self Tapping Screw. Slide
Flybar Arm Bushing and Flybar Control Arm onto the Flybar Rod. From the other end of the Flybar Rod, slide on
the Flybar Seesaw Hub. Make sure the Flybar has equal protruding from each side of the Seesaw Hub, then install
and tighten the HME4-5B set screws. Add the Paddles. Make sure the two Paddles and the two Flybar Control Arms
are all parallel. Lock the Paddles with HME3-10B set screws.
Attaching four Linkage Balls to the Mixing Levers first. Then assemble and install the Mixing Levers ,Bearings and
washers using Collar with Socket Screw. Be careful don't let the Loctite seep into the bearings.
Attach the Bearings into the Main Rotor Hub. Insert and tighten the Set Screws. Attach the Flybar Control Rod to
the Flybar Control Arm and use the Double Link to connect the mixing Lever (short side) to the Main Rotor Pitch
Housing.
Note:The equipped with Paddle is good for stable and beginner flying. For those aggressive 3D pilots, we would
recommend our optional light 3D Paddle (PV0481) or ultra light Paddle (PV0482) which weights only 25g and 20g.
(1)BK0002 Flybar Control Arm....................... 2
(2)BK0004 Flybar Seesaw Hub...................... 1
(3)BK0005 Flybar Arm Bushing......................2
(4)BK0006 Mixing Lever................................. 2
(5)BK0067 Flybar Paddle............................... 2
(6)BK0075 Linkage Ball..................................6
(7)BK0076 Collar (d3xD4x10)........................ 2
(8)BK0078 Collar (d3xD4x4).......................... 2
(9)BK0088 Washer (d3xD5x0.5).................... 2
(10)BK0631 SUS Flybar............................... 1
(17)
(7)
(11)BV0085 Double Link................................ 2
(12)HMC3-14B Socket Screw (M3x14).......... 2
(13)HMC3-8B Socket Screw (M3x8).............. 2
(14)HME3-10B Set Screw (M3x10)................ 2
(15)HME4-5B Set Screw (M4x5).................... 2
(16)HMJ2-10N Self Tapping Screw (M2x10)..6
(17)HMV740ZZY Bearing (d4xD7x2.5)...........4
(18)HMV840ZZY Bearing (d4xD8x3)..............2
(19)Main Rotor Head Assembly......................1
(9)
(6)
(2)
(19)
13
(15)
(1)
(16)
(3)
(18)
(8)
(11)
(13)
(5)
(10)
(14)
(4)
(12)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents