Preinstallation requirements
Unpacking the 703t server
Introduction
Follow this procedure to unpack the server and peripherals.
Warning:
Risk of personal injury
The 703t Avaya CallPilot
manufacturing. If necessary, and to prevent personal injury, ask someone to help you unpack
and position the server.
To unpack the equipment
Important:
As you unpack each item, check it off against the packing list, as well as against the following
checklists provided in the Installation and Configuration Task List (NN44200-306):
• "CallPilot software media and documentation checklist"
• "CallPilot server hardware checklist"
1. Carefully open the cardboard carton containing the server.
2. Remove the server from the carton and set it on the floor.
3. Carefully open the cartons containing the monitor, keyboard, mouse, modem, and
4. Put all manuals, CD-ROMs, operating system disks, and any disks for peripherals
5. Save all packing materials and cartons in case you must return any equipment to
26
Avaya CallPilot® 703t Server Hardware Installation
®
server weighs approximately 22 kg (46 lb) as shipped from
ELAN hub (if supplied), and set the peripherals aside.
in a safe place.
the carrier.
December 2010