Unpacking The 703T Server; Introduction; To Unpack The Equipment - Avaya CallPilot 703t Hardware Installation

Hide thumbs Also See for CallPilot 703t:
Table of Contents

Advertisement

Preinstallation requirements

Unpacking the 703t server

Introduction

Follow this procedure to unpack the server and peripherals.
Warning:
Risk of personal injury
The 703t Avaya CallPilot
manufacturing. If necessary, and to prevent personal injury, ask someone to help you unpack
and position the server.

To unpack the equipment

Important:
As you unpack each item, check it off against the packing list, as well as against the following
checklists provided in the Installation and Configuration Task List (NN44200-306):
• "CallPilot software media and documentation checklist"
• "CallPilot server hardware checklist"
1. Carefully open the cardboard carton containing the server.
2. Remove the server from the carton and set it on the floor.
3. Carefully open the cartons containing the monitor, keyboard, mouse, modem, and
4. Put all manuals, CD-ROMs, operating system disks, and any disks for peripherals
5. Save all packing materials and cartons in case you must return any equipment to
26
Avaya CallPilot® 703t Server Hardware Installation
®
server weighs approximately 22 kg (46 lb) as shipped from
ELAN hub (if supplied), and set the peripherals aside.
in a safe place.
the carrier.
December 2010

Advertisement

Table of Contents
loading

Table of Contents