B. NAILING TAB INSTALLATION
STEP 1: Refer to Figure 3B.1
The eight (8) nailing flanges will be shipped in
a flat state placed on the firebox side;
four (4) on each side. Locate the nailing
flanges and remove the screws holding them
in place.
Heat & Glo • FDN-4-ST, FDN-5-ST, FDN-6-ST, FDN-7-ST Installation Manual • 16400-9801 Rev. H • 11/19

3 - PREPARE THE FIREPLACE

Figure 3B.3
STEP 2: Refer to Figure 3B.2
Bend the two (2) small tabs out on each
nailing flange at the perforated lines. Using
Figure 3A.3 for reference, locate the pre-
drilled holes on the firebox side each nailing
flange will be placed at.
Figure 3B.4
Figure 3B.2
1"
Figure 3B.5
STEP 3: Refer to Figure 3B.3 & Figure 3B.4
Set each nailing flange in place and secure
using two (2) screws each. Bend the nailing
flange out from fireplace at the perforated line.
The nailing flanges will ensure the
1" minimum clearance is kept to
combustible framing.
Refer to Figure 3B.5
Depending on your installation and how you
frame it out, you may not use the provided
nailing flanges.
Figure 3B.3