Further details regarding the individual steps
3. Record the setting for maximum
output on the additional type plate
supplied with the "Technical docu-
mentation". Affix the type plate next
to the type plate on top of the boi-
ler.
Testing the balanced flue system (annular gap test) for
soundness
A Combustion air test port (ventila-
tion air)
Draining the heating system
!
Please note
Risk of scalding
Only drain the heating system
when the boiler water or the
cylinder temperature has
dropped below 40 °C.
Initial start-up, inspection, maintenance
(cont.)
The flue pipe is deemed to be sound if
the CO
concentration in the combus-
2
tion air is no higher than 0.2 % or the
O
concentration is at least 20.6 %.
2
If actual CO
values are higher or O
2
values are lower, then pressure test
the flue pipe with a static pressure of
200 Pa.
2
29