Further details regarding the individual steps
A Test port
1. Close the gas shut‐off valve.
2. Release the screw inside test port
A at the gas combination valve,
but do not remove it, and connect
the pressure gauge.
3. Open the gas shut‐off valve.
Supply (flow)
Supply (flow)
pressure for nat-
pressure for
ural gas
LPG
below 17.4 mbar
below 42.5 mbar
17.4 to 57.5 mbar
42.5 to 57.5 mbar
in excess of
in excess of
57.5 mbar
57.5 mbar
Initial start-up, inspection, maintenance
(cont.)
4. Record the static pressure and
record it in the service report on
page 121.
Set value: max. 57.5 mbar
5. Start up the boiler.
Note
During commissioning, the boiler
can enter a fault state because of
airlocks in the gas pipe. After
approx. 5 s press "E" to reset the
burner.
6. Check the supply (flow) pressure.
Set value:
&
Natural gas: 20 mbar
&
LPG: 50 mbar
Note
To measure the supply pressure,
use suitable test equipment with a
resolution of at least 0.1 mbar.
7. Record the actual value in the ser-
vice report on page 121.
Take the action shown in the table.
Remedy
Never start up. Notify your mains gas
or LPG supplier.
Start up the boiler.
Install a separate gas governor down-
stream of the system and regulate the
inlet pressure to 20 mbar for natural
gas or 50 mbar for LPG. Notify your
mains gas or LPG supplier.