Further details regarding the individual steps
6. Test the nozzle pressure at the
upper rated output. In case of
deviations from the value
shown in the following table,
adjust the nozzle pressure for the
upper rated output, using screw
C (SW 10).
7. Press d.
Operation with the upper rated
output is terminated.
Note
The values in the nozzle pressure table apply to the following ambient con-
ditions:
&
Air pressure: 1013.25 mbar
&
Temperature: 15 °C
Nozzle pressure table
Rated output
Nozzle pressure
Gas
Wobbe index
Natural
14.1 kWh/m
gas E
50.7 MJ/m
Natural
12.4 kWh/m
gas LL
*1
Only for DHW heating
Initial start-up, inspection, maintenance
8. Select the lower rated output.
9. Test the nozzle pressure at the
Supply pres-
Nozzle
7 in
sure in mbar
mm
3
20
1.25
3
3
20
1.40
(cont.)
Constant temperature control
unit:
K + d press simultaneously:
"1" is shown on the dis-
play
Weather–compensated control
unit:
K + d press simultaneously:
"Relay test" and then
"Base load" is shown on
the display
lower rated output. In case of
deviations from the value
shown in the following table,
adjust the nozzle pressure for the
lower rated output using cross‐
head screw D. Counter the tor-
que applied by holding screw C
(SW 10).
kW 10.5
mbar
2.0 10.2
mbar
2.0 10.2
24
29
*
1
15.1
14.7
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents