installation
Unit Assembly Prior to Installation:
After the framing has been built, the nail-
ing Flanges will need to be set depending
on the depth of finishing material being
used. Up to 11/4" total material thickness
can be used, including the backing mate-
rial. The depth of finishing material can be
adjusted in 1/4" increments.
1. Determine the required depth set-
ting for the materials being used.
2. Once the setting has been chosen,
install the Left and Right Nail-
ing Flanges with 2 screws on each
Flange.
|