Nailing Flange Installation:
1. Screw one screw into the rear hole on each Side Nailing Flange.
2. Install the Top Nailing Flange with 4 screws.
3. Slot the Standoff Deflector onto the back screws, then secure the with a screw through the
remaining front hole on each flange.
CLEAN FRONT
Flush Finishing Material
Backing Material (Drywall etc.)
Finishing Material
Top Nailing
Flange
Standoff Deflector
OUTSIDE FINISH
*Distance to
combustible material
varies with install*
Total Material
Maximum Depth: 1
installation
Backing Material (Drywall etc.)
Finishing Material
1/4"
Grandview® G800EC Gas Fireplace
|
39