Desktop Installation - Planet FGSW-2022VHP User Manual

12-port 10/100tx 802.3at poe + 4-port 10/100tx 802.3bt poe + 2-port gigabit tp + 2-port sfp ethernet switch with lcd management
Table of Contents

Advertisement

3.1 Desktop Installation

To install the LCD switch on desktop, simply follow the following steps. The switch
shown on this page and thereafter is just a representation of the said switch.
Step 1: Attach the rubber feet to the recessed areas on the bottom of the LCD
switch, as shown in Figure 3-1.
Men u (5
sec)
Ente r
Back
Figure 3-1: Attaching the Rubber Feet to the LCD Switch
Step 2: Place the LCD switch on desktop near an AC power source.
Step 3: Keep enough ventilation space between the LCD switch and the
surrounding objects.
When choosing a location, please keep in mind the environmental
restrictions discussed in Chapter 1, Section 4, under Specifications.
Note
Step 4: Connect your LCD switch to 802.3af/at/bt complied power devices (PDs)
and other network devices.
A. Connect one end of a standard network cable to the 10/100BASE-TX
RJ45 ports on the front panel of the LCD switch.
B. Connect the other end of the cable to the network devices such as
printer servers, workstations or routers, etc.
Connection to the switch requires UTP Category 5, 5e, 6 network
cabling with RJ45 tips.
Note
Step 5: Supply power to the LCD switch.
A. Connect one end of the power cable to the LCD switch.
B. Connect the power plug of the power cable to a standard wall outlet.
When the LCD switch receives power, the power LED should remain solid green.
26
Up
FG SW -26
22V HP
2
4
6
8
10
PWR
12
14
Giga bit
2
Dow n
16
18
4
20
22
24
6
1
3
26
28
PoE
5
7
8
9
11
13
10
15
17
19
12
21
23
LNK
25
27
LNK
14
PoE In-Us
ACT
ACT
e
16
10/10 0
1000
18
1
3
5
7
9
11
13
15
17
20
22
24
26
28
19
21
23
25
27

Advertisement

Table of Contents
loading

Table of Contents