Rack Mounting - Planet FGSW-2022VHP User Manual

12-port 10/100tx 802.3at poe + 4-port 10/100tx 802.3bt poe + 2-port gigabit tp + 2-port sfp ethernet switch with lcd management
Table of Contents

Advertisement

3.2 Rack Mounting

To install the LCD switch in a 19-inch standard rack, follow the instructions
described below.
Step 1: Place your LCD switch on a hard flat surface, with the front panel
positioned towards you.
Step 2: Attach a rack-mount bracket to each side of the LCD switch with supplied
screws attached to the package. Figure 3-2 shows how to attach brackets
to one side of the LCD switch.
Figure 3-2: Attaching the Brackets to the LCD Switch
You must use the screws supplied with the mounting brackets.
Damage caused to the parts by using incorrect screws would invali-
date the warranty.
Step 3: Secure the brackets tightly.
Step 4: Follow the same steps to attach the second bracket to the opposite side.
Step 5: After the brackets are attached to the LCD switch, use suitable screws to
securely attach the brackets to the rack, as shown in Figure 3-3.
Figure 3-3: Mounting the LCD Switch in a Rack
Men u (5
sec)
Ente r
Up
FG SW -26
22V HP
Back
2
4
6
8
10
12
2
PWR
14
16
Giga bit
Dow n
18
4
20
22
1
24
26
6
3
5
28
8
PoE
7
9
11
13
15
17
19
21
LNK
23
25
LNK
ACT
27
ACT
PoE In-Us
e
10/10 0
1000
1
3
5
7
Menu (5
sec)
Ente r
Up
FG SW -26
22V HP
Back
2
4
6
8
10
12
2
PWR
14
Giga bit
Down
16
18
4
20
22
1
24
26
6
3
5
28
8
PoE
7
9
11
13
15
10
17
19
12
21
23
LNK
25
LNK
PoE In-Us
ACT
27
ACT
e
10/10 0
1000
1
3
5
7
9
11
10
12
14
16
18
20
22
24
26
28
9
11
13
15
17
19
21
23
25
27
14
16
18
20
22
24
26
28
13
15
17
19
21
23
25
27
27

Advertisement

Table of Contents
loading

Table of Contents