Perform Engine Maintenance - Deutz 1011F Models - Genie GS-3390 Service Manual

Hide thumbs Also See for GS-3390:
Table of Contents

Advertisement

Section 3 • Scheduled Maintenance Procedures
CHECKLIST E PROCEDURES
25 Install the T-fitting with the 2 hoses connected
to it.
26 Fill the tank with hydraulic oil until the level is
within the top 2 inches / 5.1 cm from the top of
the sight gauge. Do not overfill. Refer to Section
2, Specifications.
27 Clean up any oil that may have spilled during
the procedure.
28 If equipped, open the hydraulic tank shutoff
valves.
Component damage hazard.
Be sure to open the two hydraulic
tank shutoff valves and prime the
pump after installing the hydraulic
tank. Refer to Repair procedure 6-
2, How to Prime the Pump .
29 Install the access plate and install the access
plate retaining fasteners.
30 Install the entry ladder and install the entry
ladder mounting fasteners.
3 - 40
E-2
Perform Engine Maintenance -
Deutz 1011F Models
Engine specifications require that this procedure
be performed every 2000 hours or two years,
whichever comes first.
Required maintenance procedures and additional
engine information is available in the Deutz 1011F
Operation Manual (Deutz part number 0297 9683).
Deutz 1011F Operation Manual
Genie part number
GS-3390 • GS-4390 • GS-5390
July 2007
REV C
52883
Part No. 72863

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs-4390Gs-5390

Table of Contents