Section 3 • Scheduled Maintenance Procedures
CHECKLIST E PROCEDURES
21 Install the hydraulic tank onto the machine.
22 Install the hydraulic tank strap.
23 Install the two suction hoses.
24 Install the tank return hose.
25 Install the T-fitting with the 2 hoses connected
to it.
26 Fill the tank with hydraulic oil until the level is
within the top 2 inches / 5.1 cm from the top of
the sight gauge. Do not overfill. Refer to Section
2, Specifications.
27 Clean up any oil that may have spilled during the
procedure.
28 Open the hydraulic tank shutoff valves.
Component damage hazard.
Be sure to open the two hydraulic
tank shutoff valves and prime the
pump after installing the hydraulic
tank.
Refer to Repair procedure 6-2, How
to Prime the Pump.
29 Install the access plate and install the access
plate retaining fasteners.
30 Install the entry ladder and install the entry
ladder mounting fasteners.
3 - 44
E-2
Perform Engine Maintenance -
Ford Models
Engine specifications require that this procedure be
performed every 2400 hours or every two years,
whichever comes first.
Required maintenance procedures and additional
engine information is available in the
Ford LRG-425 EFI Operator Handbook
(Ford part number FPP 194-302) OR the
Ford DSG-423 EFI Operator Handbook
(EDI part number 1060020).
Ford LRG-425 EFI Operator Handbook
Genie part number
Ford DSG-423 EFI Operator Handbook
Genie part number
GS-84 • GS-90
January 2013
84792
119488
Part No. 84793