Platform Overload Components; Platform Overload System - Genie GS-3384 Service Manual

Hide thumbs Also See for GS-3384:
Table of Contents

Advertisement

January 2013
12-1

Platform Overload System

How to Calibrate the Platform
Overload System (if equipped)
On machines with platform overload systems,
proper calibration is essential to safe machine
operation. An improperly calibrated platform
overload system could result in the system failing
to sense an overloaded platform. The stability of
the machine is compromised and it could tip over.
Note: Be sure the hydraulic oil level is between the
full and add marks on the oil level indicator.
Note: Perform this procedure with the machine on
a firm, level surface that is free of obstructions.
All models:
1 Models with outriggers: Deploy the outriggers
and level the machine.
2 Apply a thin layer of dry film lubricant to the
area of the chassis where the scissor arm wear
pads make contact.
3 Disconnect the platform controls from the
machine at the platform.
4 Open the large ground control panel door and
locate connector joining the Electronic Control
Module (ECM) wire harness and the platform
controls wire harness.
Note: This connection is just below the ground
controls.
5 Tag and disconnect the platform controls wire
harness from the ECM wire harness.
Part No. 84793

Platform Overload Components

GS-84 • GS-90
Section 4 • Repair Procedures
6 Securely connect the platform controls to the
ECM wire harness.
7 Using a suitable lifting device, place a test
weight, corresponding to the maximum load as
indicated on the capacity indicator decal, in the
center of the platform floor. Secure the weight
to the platform. Refer to the chart below.
GS-3384 and GS-3390
GS-4390
(most models - refer to capacity indicator decal)
GS-4390
(some models - refer to capacity indicator decal)
GS-5390
8 Turn the key switch to platform control and pull
out the red Emergency Stop button to the on
position at both the ground and platform
controls. Start the engine.
9 Raise the platform to approximately 6 m.
10 Release the safety arm latch, lift the safety arm
and rotate to a vertical position. Lock the safety
arm in position.
11 Loosen the retaining ring and remove the switch
adjustment cover from the pressure switch(es).
Note: The pressure switch is located on the lift
cylinder.
12 Using a small slotted screwdriver, turn the
adjustment screw of the platform overload
pressure switch(es) one-quarter turn into the
hydraulic line.
13 Push in the red Emergency Stop button to the
off position at the ground controls.
1878 kg
1286 kg
1421 kg
1410 kg
4 - 99

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs-3390Gs-4390Gs-5390

Table of Contents