Commissioning The Device; General Information On Commissioning - Siemens SIMATIC IPC647D Operating Instructions Manual

Hide thumbs Also See for SIMATIC IPC647D:
Table of Contents

Advertisement

Commissioning the device

4.1

General information on commissioning

NOTICE
Risk of damage to the device!
Make sufficient allowances for the device to acquire room temperature before you put it into
use. If condensation has developed on the device wait at least 12 hours before you switch it
on.
Note
Switching the device on
Depending on the device model, the power supply has either one or two on/off switches as a
power switch.
If at least one of these on/off switches at the rear of the device is in position "1" (on), the
device can be switched on using the on/off button at the front.
If all the on/off switches at the rear of the device are in position "0" (off), the device takes the
least amount of power from the AC mains. The device cannot be switched on using the
on/off button at the front in this case.
Both on/off switches must therefore be in the "0" position, especially for the model with
redundant power supply. This is because the device is operational even with one active
power supply module.
Requirements for commissioning
The following requirements have to be met before you can start commissioning:
● I/O devices, keyboard, mouse and monitor are connected.
● The power supply is connected.
● An operating system is installed.
SIMATIC IPC647D
Operating Instructions, 01/2014, A5E32996306-AA
The device can be supplied without an operating system. Information on installation of the
operating system is available in the section "Installing the software".
4
45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents