Ascaso BIG DREAM User Manual page 33

Hide thumbs Also See for BIG DREAM:
Table of Contents

Advertisement

Available languages

Available languages

Press 'Next' and the pre-established rinsing cycle will start when you press the central
key of the group.
Once rinsing has finished, the groups will be ready to go back into service.
To do so, come out of maintenance mode by pressing the icon
and the groups will
start heating up until they reach the service temperature.
FLUSH MANAGEMENT
In this section you can change the different flushing and rinsing cycles; in other words,
you can vary the start and stop times of the group and the number of repetitions of
each action, whether flushing or rinsing.
Press the time figure to change the times.
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents