Omron G9SP-N20S Network Connection Manual page 21

Safety controller
Hide thumbs Also See for G9SP-N20S:
Table of Contents

Advertisement

9
The Synchronization Dialog Box
is displayed.
Confirm that the data to transfer
(NJ501 in the right figure) is
selected. Then, click the
Transfer to Controller Button.
10
A confirmation dialog is
displayed. Click the Yes Button.
A screen stating "Synchronizing"
is displayed.
A confirmation dialog box is
displayed. Click the No Button.
11
Confirm that the synchronized
data is displayed with the color
specified by "Synchronized" and
that a message is displayed
stating "The synchronization
process successfully finished".
If there is no problem, click the
Close Button.
*If the synchronization fails,
check the wiring and repeat the
procedure described in this
section.
7. Connection Procedure
18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nj seriesG9sp series

Table of Contents