Installing the unit
5.2 Lifting the unit off the pallet
CAUTION
Prerequisite Unit unpacked
5.3 Installing the unit on the unit legs
Prerequisite The floor must support the weight of the unit
5.4 Aligning the unit
18
Risk of property damage and personnel injury from tipping unit
• Stay clear of lifted unit.
• Move lifted unit carefully.
Protective film removed
Unit cleaned
1. Slide the forks of the pallet truck under the unit.
2. Carefully lift the unit off the pallet.
1. Use appropriate lifting gear to lift the unit.
2. Install the unit in accordance with the planning drawing.
3. Align the unit lengthwise and crosswise (see "Aligning the unit").
Image: Aligning the unit on the unit legs
1. Place a spirit level on the unit.
2. Align the unit horizontally by screwing the unit legs in or out.
3. Fill out the start-up operation report.
Installation instructions