Henny Penny FlexFusion Spacesaver Installation Manual page 33

Electric team
Hide thumbs Also See for FlexFusion Spacesaver:
Table of Contents

Advertisement

8 Putting the unit into service
INFORMATION
Prerequisite Electrical connection made
8.1 Filling out the Start-up operation report
Information from the nameplate entered?
SN:
E:
Bez:
Item-Nr.:
Obvious damage to the unit?
What and where?:
Unit levelled?
Electrical connection made properly?
Potential equalization
Potential-free contact
Electrical connections made properly?
Fault current device connected directly before this unit?
Fault current device connected before this and other units?
Kitchen guiding system connected properly?
Temperature unit set?
°C
Date and time set?
If the unit is not put into service immediately after being connected and the
function check, all inspections must be repeated.
Water connection made
Waste water connection made
Function successfully tested
Housing closed
1. Instruct operator.
2. Fill out the start-up operation report.
General information
Typ:
(if listed)
Electrical connection
Power optimization system
Kitchen guiding system
Basic setting of the control
°F
Installation instructions
Putting the unit into service
Yes
Yes
Yes
Yes
No
No
No
No
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fsde 610.610Flexfusion spacesaver plus

Table of Contents