Commissioning and Diagnostics
6.7 Commissioning and starting up the ET 200iSP
6.7.2

Requirements for commissioning

Requirements
Table 6-7
Step
1
2
3
4
5
6
7
See also
General Rules and Regulations for Wiring (Page 103)
6.7.3

Commissioning the ET 200iSP

Commissioning the ET 200iSP
Table 6-8
Step
1
2
148
Requirements for commissioning
Prior Activity
ET 200iSP is installed
PROFIBUS address is set on the ET 200iSP
ET 200iSP is wired up
Zone 1, zone 21, zone 2 and zone 22: Additional
check of the installation and wiring of the ET 200iSP,
connections, enclosure, and supply lines.
The project engineering of the ET 200iSP is comple‐
ted (configuration and parameter assignment)
The power supply for the DP master is on
DP master switched to RUN operating state
Commissioning the ET 200iSP
Procedure
Turn on the power supply for the ET 200iSP.
Watch the STATUS LEDs on the ET 200iSP and on
the DP master.
See...
Chapter "AUTOHOTSPOT"
Chapter "AUTOHOTSPOT"
Chapter "AUTOHOTSPOT"
Chapter "Basics of commissioning
and diagnostics (Page 133)"
Manual to the DP master
Manual to the DP master
See
Section "AUTOHOTSPOT"
● Section "Basics of
commissioning and diagnostics
(Page 133)"
Manual to the DP master
Operating Instructions, 11/2017, A5E00247483-07