Typical Floor Unit Installation - Daikin AVV Installation And Maintenance Manual

Classroom unit ventilators floor models digital ready, microtec control (“j” vintage) field controls by others
Hide thumbs Also See for AVV:
Table of Contents

Advertisement

Typical Floor Unit Installation

Figure 32: Typical Classroom Unit Ventilator Installation And Louver Details (see installation section for typical warnings
and cautions)
Lintel (by others)
Weep Holes
Caulk
Weep
Holes
Figure 33: Typical VentiMatic Shutter Assembly Installation (see installation section for typical warnings and cautions)
Louver
Unit Ventilator
Outdoor Air Opening
www.DaikinApplied.com
Internal Column For
Wall Bracing (By Others)
Unit Insulating Blanket
Bird
Screen
Back Of Unit
Unit Outside Air Opening
Unit Bottom Gasket
Seal Under Unit
Floor
Sealed Mortar Bed
Outside
Roomside
Screws or Bolts (by others)
Pipe Tunnel
Unit Gasket
Unit Gasket
Caulk Top And Two Sides Of Louver
VentiMatic Shutter Assembly
Building Wall
Outside
Typical VentiMatic louver installation with shelving.
15
1" End Panel w/Cut Out
Roomside
IM 817-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

AvsAvbAvr

Table of Contents