Unit Installation; Preparing The Installation Site; Installation Site Requirements For The Heat Reclaim Ventilation Unit; Preparing The Unit - Daikin VAM-J8 Installation And Operation Manual

Heat reclaim ventilation unit
Hide thumbs Also See for VAM-J8:
Table of Contents

Advertisement

11 Unit installation

INFORMATION
When connected to an EKVDX, the minimum airflow during
normal operation or during the refrigerant leakage
detection is always >240 m
11
Unit installation
11.1

Preparing the installation site

Do NOT install a heat reclaim ventilation unit or air suction/discharge
grille in the following places:
▪ Places, such as machinery plants and chemical plants, where
noxious gases or corrosive components of materials such as acid,
alkali, organic solvent and paint are present.
▪ Places, such as bathrooms, subject to moisture. Moisture can
cause electrical shock, electric leakage and other failures.
▪ Places subject to high temperature or direct flames.
▪ Places subject to much soot. Soot clings to air filter and heat
exchange elements, disabling them.
11.1.1
Installation site requirements for the heat
reclaim ventilation unit
CAUTION
See
"2  Specific installer safety
sure this installation complies with all safety regulations.
Service space
See
"17.2 Service
space" [ 4  28].
11.2

Preparing the unit

CAUTION
See
"2  Specific installer safety
sure this installation complies with all safety regulations.
INFORMATION
▪ Flexible ducting with sound insulation is effective to
reduce blowing noises.
▪ When selecting installation materials, consider the
required volume of air flow and the acceptable level of
noise for that particular installation.
▪ When room air infiltrates into the ceiling and the
temperature and humidity in the ceiling become too
high, insulate the metal parts of the unit.
▪ ONLY use the inspection hole to access the inside of
the unit.
▪ The sound pressure level is less than 70 dBA.
Installation and operation manual
10
3
/h.
instructions"  [ 4   3] to make
instructions"  [ 4   3] to make
11.2.1

To install the optional adapter PCB

For models 350-500-800-1000
a
f
a
BRP4A50A (optional accessory)
b
KRP2A51 (optional accessory)
c
KRP1BA101 (installation box)
f
Screw
g
Screw (supplied with the installation box)
1 Remove the screws from the unit.
2 Attach the optional adapter PCB (KRP2A51) in the installation
box (KRP1BA101).
3 Follow the installation instructions provided with the option kits
(BRP4A50A, KRP2A51 and KRP1BA101).
4 Guide the PCB wire through the dedicated holes and attach it
as instructed in "Opening the switch box" in the installer and
user reference guide.
5 Attach the options to the unit, as shown in the figure.
6 After the wires are connected, fasten the switch box cover.
For model 650
a
d
f
a
BRP4A50A (optional accessory)
b
KRP2A51 (optional accessory)
c
KRP1BA101 (installation box)
d
EKMP65VAM (mounting plate)
f
Screw
g
Screw (supplied with the installation box)
1 Remove the screws from the unit.
2 Attach the optional mounting plate (EKMP65VAM) to the unit.
3 Attach the optional adapter PCB (KRP2A51) in the installation
box (KRP1BA101).
b
f
c
g
f
b
c
f
g
f
VAM350~2000J8VEB
Heat reclaim ventilation unit
4P664011-1 – 2021.08

Advertisement

Table of Contents
loading

Table of Contents