Installing The Column Compartment - Agilent Technologies 1100 Series Reference Manual

Thermostatted column compartment
Hide thumbs Also See for 1100 Series:
Table of Contents

Advertisement

Installing the Column Compartment

Preparations
Parts required
1 Place the column compartment in the stack or on the bench in a horizontal
2 Ensure the power switch at the front of the column compartment is OFF.
Status indicator
green/yellow/red
Line power switch
with green light
Figure 4
3 Connect the power cable to the power connector at the rear of the column
4 Connect the CAN cable to other Agilent 1100 Series modules.
5 If a Agilent ChemStation is the controller, connect either
6 Connect the APG Remote cable (optional) for non-Agilent 1100 Series
7 Turn on power by pushing the button at the lower left side of the column
1100 Series TCC Reference Manual
Locate bench space.
Provide power connections.
Unpack the Column compartment.
Column compartment
Power cord, for other cables see text below and
position.
Front View of the Thermostatted Column Compartment
compartment.
the GPIB cable to the detector or
the LAN connection to the LAN interface board in the detector.
instruments.
compartment. The status LED should shine green.

Installing the Column Compartment

"Cable Overview"
1
on page 113.
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents