Buderus G315 Assembly, Maintenance And Operating Instruction page 9

Table of Contents

Advertisement

6 Boiler Assembly
Boiler block sectional arrangement
The boiler is always assembled starting with the rear section
and finishing with the front section.
The arrow markings on the sections must point to the rear
(Fig. 6) and use the sequence in Table 5.
Table 5: Boiler section arrangement
No. of
Model
Front Section
315/5
1
315/6
1
315/7
1
315/8
1
315/9
1
Assembly of individual boiler sections
Remove the nuts and washers from the rear and
front sections prior to boiler assembly.
Note the arrow marking on each section. These
arrows are located on the top left and right of
each section and must point to the rear during
boiler assembly (Fig. 6).
Assemble the boiler on a smooth hard surface
with flat steel plates underneath to permit easy
sliding of sections.
Position and align the rear section upright in
final location and secure it from falling over
(Fig. 7).
To reduce the risk of injuries, support the boiler
section or secure it with an overhead lifting device.
8
No. of
No. of
Midsections
Rear Section
3
1
4
1
5
1
6
1
7
1
Rear
section
Middle sections
Flue gas
collector
Assembly
arrow marking
Fig. 6
Fig. 7
Front
section

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents