10 Installation of Hydronic Control Components

Installation of supply header and controls
NOTE: The G315 boiler can be equipped with 2" or 3" supply/return connections depending on items
ordered. The 3" supply manifold is suitable for commercial installations.
Refer to Figure 37 for details on the 3" supply header for use in commercial installations
requiring multiple aquastats.
Secure supply manifold with supplied nuts and gasket to supply connection in desired
orientation.
Secure return flange/manifold with gasket to return connection.
Install low water cut-off probe and P&T gauge in appropriate tappings (3" header only).
*
Install relief valve after performing the hydrostatic test.
Pipe the relief valve discharge to a floor drain in accordance with local code requirements.
Install required number of 3/4" immersion wells in 3" supply header tappings.
NOTE: If a Buderus Ecomatic is used, install the Ecomatic well and the Ecomatic sensors in the
rear boiler tapping.
Install the L8148A aquastat in rear boiler tapping.
Install the supply temperature control aquastat (if required) in a 3/4" tapping.
For commercial installations, install the L4006E1109 manual reset in the rear boiler tapping.
Install L4006A1058 operating aquastat in another 3/4" immersion well of 3" the supply manifold.
(Install second L4006A1058 aquastat for Low/Hi/Low burner operation).
Plug all unused tappings.
20
3" NPT
1/2" P & T Gauge
3/4"
Aquastat
Tappings
6"
3.5"
2.5"
65 mm German Bolt—on Flange
Fig. 37
3" Commercial Supply Manifold
3/4" Low
Water Cutoff
Tapping
3/4"
Relief Valve
9"
6.5"
5"