8 Installation of Boiler Components
Flue gas baffle plates
•
Flue gas baffle plates are factory installed in an
assembled boiler. Remove corrugated card board
from baffle plates and insert plates as shown in
Figure 21.
NOTE: Install the baffle plates per schedule below.
Table 6: Baffle Plate Arrangement
No. of Sections Number of Baffles Length (in)
5
4
6-7
4
8
4
9
4
Burner Door
•
Attach sealing rope to front section by applying
several drops of glue (P/N 422841) every 6" in the
sealing grooves surrounding the combustion
chamber and the outer area of the front section
(Fig. 22).
•
Insert the permanent pliable sealing rope in the
grooves on the front section.
•
The burner door hinge supports are factory
installed on the right side. Remove and mount
them on the opposite side with (2) M12x35 bolts
for a left hanging door if required.
•
Secure the door hinges, if required, with (2) M12x35
bolts to the proper side of boiler front section
(Fig. 22).
•
Hang the burner door on the door hinges.
14
Placement
1 /4"
14
top & bottom (left & right)
1 /4"
17
top & bottom (left & right)
1 /4"
14
top & bottom (left & right)
8"
top & bottom (left & right)
Flue gas baffle plates
Flue gas baffle plates
Fig. 21
Sealing rope
Door hinge
support
Fig. 22