Prepare The Multi-Hopper - DataCard CR825 Installation And Administrator's Manual

Instant issuance system
Table of Contents

Advertisement

Prepare the Multi-Hopper

The multi-hopper ships with the enclosure transition folded down with a restraining pin holding it
in position.
1.
Remove the restraining pin from the enclosure transition by pulling it straight up from the
unit.
2.
Rotate the enclosure transition 90° so that it aligns with the top of the multi-hopper unit.
CR825 and CE875 Instant Issuance System Installation and Administrator's Guide
Restraining Pin
Enclosure
Transition
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ce875

Table of Contents