Bosch BIS 2.3 Installation Manual page 80

Access engine
Table of Contents

Advertisement

80
en | DMS - Data Management System
Named Parameter
type
ready
batchStart
batchPeriod
errorReset
exitNumber
Table 10.1 Block entries in the process description file
The processes are started in the sequence in which they appear
in the process description, except for the batch processes.
F.01U.028.713 | V 2.3.0.1 | 2009.11
Description
Process type:
BASE: Base Process - the process is
essential. If such a process fails then
the BIS system as a whole will crash.
NORMAL: the process is not treated
in a special manner. Failed processes
of this type are typically restarted by
their parents.
BATCH: The process is a batch
process that is started at a particular
time.
Indicates whether the master has to
wait until the process has sent the
message that it is ready.
0: master does not have to wait.
1: master has to wait for the ready
message.
Start time of the batch processes
Describes how the processes are
started periodically at different
times: DAILY: has to be started daily.
WEEKLY: has to be started weekly.
Time after which the error counter is
reset (in hours).
Describes the process order for
shutting down the system.
restartLimit - maximum number of
restarts permitted. In case of a
process failure, a restart counter is
set up and the process is restarted. If
the restart counter exceeds the
restart limit, the process is no longer
restarted.
Installation manual
BIS 2.3 - Access Engine
Bosch Sicherheitssysteme GmbH

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents