Preparing The Backup Battery - Panasonic fp2/fp2sh User Manual

Programmable controller
Table of Contents

Advertisement

FP2/FP2SH
4.1.4

Preparing the Backup Battery

With the FP2, be sure to remove the insulating sheet of the backup battery before instal-
ling the CPU onto backplane.
Insulating sheet
With the FP2SH, connect the connector of backup battery.
Make sure the connector terminals are positioned in the correct directions.
IC memory card: AFP2209
The battery has been removed from the battery holder before shipment. Install the bat-
tery before mounting the CPU unit.
1.
2.
Move to the lock switch to the RELEASE position (to-
ward the battery holder).
RELEASE position
Remove the battery holder.
Installation and Wiring
Lock switch
Battery holder
4.1
Installation
4 − 13

Advertisement

Table of Contents
loading

Table of Contents