Operation; General; 400 Hz. Operation Procedure - Hobart 60CU20 Operation And Maintenance Manual With Illustrated Parts List

60 kva, 3 phase, 115/200 volt, 400 hz. generator set. series 500062
Table of Contents

Advertisement

OM-2226 / Operation and Maintenance Manual
60CU20 / Series 500062 / 400 Hz. Generator Set
Section 3

1) General

This section contains information and instructions for the safe and efficient operation of the equipment.
Operating instructions are presented in step-by-step sequence of procedures to be followed in supplying
400-Hz power.
NOTE: Read ALL of the operating instructions before attempting to operate the equipment.
WARNING
Ear protection equipment may be necessary when working close to this equipment.
2) 400 Hz. Operating Procedure
a) Pre-start Inspection
(1) Be sure the fuel shutoff valve on the unit is open.
(2) Ensure 12 VDC power is available to the engine starting system.
(3) Check the engine and generator compartments to make certain they are free of rags or other
foreign materials.
(4) Make certain there is sufficient lubricating oil and coolant in the engine.
(5) Check that all circuit breakers are reset.
(6) Make certain the "STARTER ENABLE/DISABLE" switch is enabled, and the "FREQUENCY
ADJUST" switch is disabled.
May 2, 2013

Operation

Chapter 1-3
Page 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

500062tr-std500062-std500062-dlx500062tr-dlx

Table of Contents