Fujitsu PRIMERGY TX300 S4 Operating Manual page 45

Hide thumbs Also See for PRIMERGY TX300 S4:
Table of Contents

Advertisement

Hardware installation
For rack systems from other manufacturers:
3rd party rack
Certain general conditions must be met:
– Installation dimensions (see the dimensions shown in figure
1
Front of rack
2
Rear of rack
A
Rack depth (comparison PRIMECENTER Rack 940/1000/1100 mm)
B
Rack width (comparison PRIMECENTER Rack 700 mm)
C
Clearance for 19" installation level
C1
Front 19" installation level
C2
Rear 19" installation level
D
Cable routing area (cable area depth) and ventilation
E
Space for front panel and ventilation
F
Space for right and left support systems
P
PRIMERGY rack installation depth
a1
Front left support upright
a2
Front right support upright
b1
Rear left support upright
b2
Rear right support upright
– Ensure that the safety mechanisms on the server, e.g. stoppers or retaining
systems, are functioning correctly.
– The shape of the rack support uprights must ensure that the telescopic rails
can be bolted at the front.
– Front bolted telescopic rails.
The rails have a linear alignment feature to ensure that they can be adjusted
to different rack depths.
– No support for cable management system (included in installation kit).
TX300 S4
Installing/removing the rack model
Operating manual
3 on page
46).
45

Advertisement

Table of Contents
loading

Table of Contents