Generating A Work Order - 3Com WX1200 Reference Manual

Wireless lan switch
Hide thumbs Also See for WX1200:
Table of Contents

Advertisement

Generating a Work
Order
Scroll down to view the MAC address assignments for the LOS points.
Use the instructions in the Ekahau Site Survey Initial Setup section of the
work order to set up the survey.
When you import the floor map into the site survey tool, make sure you
use the map name specified in the work order. The site survey data will
not appear when you import RF measurements into 3WXM unless the
map name is correct.
A work order provides all of the necessary information for the physical
installation of the 3Com Mobility System. A work order shows where the
MAP access points should be installed, WX initial setup configuration
information, and projected RSSI information that is useful when verifying
the installation.
The work order has meaning only after you add planning information.
(See "Planning the 3Com Mobility System" on page 71.)
1 Select the Reports tool bar option.
2 In the Report Category list, select RF Plan Reports.
3 In the Reports list, select Work Order.
4 Select the scope for the work order. You can select the network plan, a
site, a building, or an individual floor.
5 Select the options you want to use for the report:
RF Coverage
RSSI Projections
Show Disabled MAPs (only available if RSSI Projections is selected)
Show RF Coverage On Entire Floor (only available if RSSI
Projections is selected)
Show Unreachable MAPs (only available if RSSI Projections is
selected)
Show MAPs on Other Floors (only available if RSSI Projections is
selected)
6 Select the language:
English
German

Generating a Work Order

401

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wx2200Wx4400Wxr100

Table of Contents