1. Unfasten four screws (M4×8) to remove the top cover from the processor unit.
2. Unfasten the three bolts circled below to remove the upper plate of the cable
clamp.
J8
J8
J5
J5
J3
J3
J12
J12
J9
J9
J6
J6
J11
J11
J4
J4
J14
J14
J13
J13
J7
J7
J10
J10
Unfasten this bolt to use
the lower clamp holes.
Unfasten these three bolts to remove the upper plate.
3. Pass the cables through the clamp holes, then fasten the bolts removed at step 2
to fix the cables.
4. Connect the WAGO connectors to the I/O Board, referring to the interconnection
diagram. See the figure at step 2 for J13 and J14.
Processor unit, top view
Lay shields of cables
under this clamp then
tighten the clamp.
Clamp holes
(upper)
Clamp holes
(lower)
J12 (main control unit)
For J13 and J14 (sub
control units).